The Town of Davie, FL desired a phased Asset Prioritization Plan for their major water and wastewater treatment facilities as part of the development of a long-term Master Plan. MME developed the field condition assessments, criticality analyses, estimated capital and O&M costs, and dynamic Prioritization Plans for repair and replacement projects to maintain system reliability over a 20-yr period. Facilities evaluated included two water treatment plants, two tertiary wastewater treatment plants, and five master wastewater pump stations for the Town of Davie, FL.